Basler-electric BE1-11g Instrukcja Użytkownika Strona 197

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 672
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 196
9424200994 Rev N 185
Figure 123. Analog Metering, Voltage Screen
Current - Primary and Secondary
Metered current includes primary and secondary phase currents (IA, IB, IC), ground current (IG), positive-
sequence current (I1), negative-sequence current (I2), and neutral current (3I0). All current
measurements are auto ranging.
Values are provided for CT circuit 1 and CT circuit 2 (for protection systems equipped with two sets of
CTs).
Primary and secondary current metering data is found in BESTCOMSPlus (Figure 124) and on the
Metering > Analog Metering > Current screen of the front-panel display. A phasor diagram is also
provided in BESTCOMSPlus.
Figure 124. Analog Metering, Current Screen
Power
Power metering data is found in BESTCOMSPlus (Figure 125) and on the Metering > Analog Metering >
Power screen of the front-panel display. A phasor diagram is also provided in BESTCOMSPlus.
Real Power
Real power is metered over a range of 7,500 kilowatts to +7,500 kilowatts on five-ampere nominal
systems. One-ampere nominal systems meter real power over a range of 1,500 watts to +1,500 watts.
Phases A, B, C, and total phase are included.
BE1-11g Metering
Przeglądanie stron 196
1 2 ... 192 193 194 195 196 197 198 199 200 201 202 ... 671 672

Komentarze do niniejszej Instrukcji

Brak uwag